Skid Packages Explained: What a Skid-Mounted System Includes

Quick answer: a skid package is a complete process unit built on a steel base frame: pumps, vessels, filters, piping, valves, instruments and usually a control panel, wired to a junction box and tested in the workshop. It arrives ready to lift into place and connect, which cuts site work, improves quality and shortens start-up.
What comes on a skid
A base frame with lifting lugs, often with a drip tray or bunded floor.
Process equipment: pumps, tanks, vessels, filters, heat exchangers or membranes.
Interconnecting piping, valves and fittings, with flanged connections at the skid edge.
Instruments: pressure, temperature, flow, level and analysers as the process needs.
Electrical and control: a junction box, local panel, PLC or HMI, and cable trays.
Documentation: drawings, data sheets, test certificates and the operation manual.
Common skid types
Skid | What it does | Typical industries |
Chemical injection | Doses inhibitors, biocides and other chemicals | Oil and gas, water |
Sampling and analyser | Takes representative samples and conditions them for analysers | Oil and gas, power, chemicals |
Filtration and membrane | Filters, softens or desalinates | Water, food, pharma |
Lubrication and oil care | Supplies, filters or flushes oil | Power, mining, heavy industry |
Laboratory and pilot test | Runs trials before scale-up | Research, process development |
How a skid is designed and built
Process design and P&ID, agreed with the client.
3D layout, checking access for operation and maintenance, and lifting.
Mechanical design to the applicable codes, for example ASME B31.3 for process piping and ASME Section VIII or PED for pressure vessels.
Electrical design for the area classification, with ATEX or IECEx equipment where the atmosphere may be explosive.
Fabrication, welding and inspection, then pressure testing.
Factory acceptance test (FAT), with the client present or by video.
Packing, shipping, installation and site acceptance test (SAT).
When a skid beats site-built equipment
Factor | Skid package | Site-built |
Quality control | Workshop conditions and FAT | Weather and site constraints |
Site time | Days to connect | Weeks to build |
Schedule | Built while the site is prepared | Starts after site access |
Relocation | Can be moved and reused | Usually dismantled |
Tech Inc. designs and builds laboratory, pilot and process skids, part of the Davey Group, which has been building engineered equipment since 1990. See skid systems, oil and gas systems and IEC 61010 explained for laboratory skids.
Frequently asked questions
What is the difference between a skid and a module?
The terms overlap. A module is often larger, may have several levels and can include its own structure and enclosure.
What is a FAT?
A factory acceptance test proves the skid works as specified before it leaves the workshop.
Can a skid be built for a hazardous area?
Yes. Equipment is selected and certified for the zone, for example under ATEX or IECEx.
What information is needed to quote a skid?
The process duty, flows, pressures, temperatures, fluids, area classification, utilities and any client standards.
Values in this guide are typical and for general information. Limits differ by membrane, instrument and chemical; always follow the manufacturer's data and your site procedures. Equipment specifications are confirmed in the quotation.