top of page

API RP 555 Explained: Process Analysers, Sample Systems and Analyser Houses

Writer: Tech Inc
Tech Inc
1 day ago
2 min read

Process analysers fail more often because of their sample systems than because of the analyser. API Recommended Practice 555, Process Analyzers, is the refinery industry's answer: a practice covering the selection, installation and maintenance of on-line analysers and everything between the process tap and the analyser inlet. The current edition is the second (2013), reaffirmed 2020.

What it covers

API's summary describes guidance on analyser types (gas chromatographs, spectrometers, physical-property analysers, electrochemical and others), the sample system (probe, transport, conditioning, disposal and fast loops), analyser houses and shelters (location, climate control, hazardous-area classification, safety gas detection), calibration and validation, and the organisational side: documentation, maintenance and performance measurement.

The design points that come out of it

  • Sample system first: the tap location, probe design, transport lag, phase control (keep gas above dew point, keep liquids single-phase), filtration and pressure reduction are specified before the analyser is chosen.

  • Fast loops to cut lag where the main line is large or the tap is far from the house.

  • Disposal: sample return to process or to a flare or drain system at a pressure the analyser can tolerate.

  • The house: a classified, climate-controlled, ventilated enclosure with gas detection and alarms, access for maintenance and the utilities (instrument air, calibration gas, power) the analysers need.

  • Validation: calibration gas handling and the records that prove the analyser is reading right.

Our equipment

Send your application, materials and the standards your contract names to mail@techincresearch.com or call +1 (289) 622-1032, and we will return a configuration, datasheet and quotation.

This article is our commentary on the standard's published scope, not a substitute for the standard itself; always work to the current edition named in your contract. Equipment specifications may change; performance depends on the application, how the equipment is used and operation in line with the operation manual.

Sources

Comments


bottom of page