Process Note: How TEG Glycol Dehydration Dries Natural Gas

At a glance. Gas leaving a separator is saturated with water. If it is not dried, it forms hydrates, corrodes pipelines and fails sales specifications. Triethylene glycol (TEG) dehydration is the standard answer for most gas plants across the world: lean glycol absorbs water from the gas in a contactor, then a regenerator boils the water off so the glycol can be used again.
How the process works
Inlet scrubbing. A filter separator or coalescer removes free liquids, hydrocarbons and solids. Most glycol problems start with dirty inlet gas.
Contactor. Wet gas rises through a tower with trays or structured packing while lean TEG flows down. The glycol picks up water; dry gas leaves the top through a mist eliminator.
Flash drum. Rich glycol is let down in pressure. Dissolved hydrocarbons flash off and can be used as fuel gas, and liquid hydrocarbons are skimmed.
Filtration. A particle filter and an activated carbon filter keep solids and dissolved hydrocarbons out of the glycol.
Regeneration. A still column and reboiler heat the glycol to drive off water. Stripping gas or a stripping column raises lean glycol purity when a low dew point is needed.
Cooling and pumping. Lean glycol is cooled in a glycol–glycol exchanger and returned to the contactor by the circulation pump.
Design points that set the dew point
Lean glycol purity. The dew point the unit can reach depends mainly on how pure the lean TEG is. Higher purity needs stripping gas or an enhanced stripping column.
Circulation rate. Expressed as litres of TEG per kilogram of water removed. Too low and the dew point drifts; too high wastes reboiler duty and pump power.
Contactor temperature. Gas that is too hot carries more water and raises glycol losses; gas that is too cold can condense hydrocarbons and foam.
Reboiler temperature. TEG starts to degrade at high temperature, so reboiler temperature is limited and controlled closely.
Number of stages. Trays or packing height decide how close the outlet gas gets to equilibrium with the lean glycol.
Common problems
Foaming from hydrocarbons, solids or corrosion inhibitors carried in with the gas, which pushes glycol out of the contactor.
Glycol losses through carry-over, vaporisation and leaks.
Degradation and acid build-up from overheating or oxygen ingress, which corrode the reboiler.
Fouled filters that are bypassed instead of replaced.
BTEX emissions from the still vent, which many jurisdictions now control.
Where Tech Inc. equipment fits
Tech Inc. builds gas dehydration skids (TEG and molecular sieve), inlet filter separator and coalescer skids, fuel gas conditioning skids that take dried gas to turbines and engines, and gas coalescer filter elements for replacement. Each skid is sized to the client's gas analysis, flow, pressure and dew point target, built in-house and factory-tested before dispatch to sites across the world.
Related reading
This note is general guidance. Each unit is designed to the project's process data and the applicable codes and standards.