Shale oil and gas skids for US operators: chemical injection, sampling, produced water and gas conditioning

Writer: Tech Inc
Tech Inc
19 hours ago
4 min read
Tech Inc. chemical injection skid for oil and gas wells and flowlines
Chemical Injection Skid

Bottom line: for US shale operators and their EPC contractors, Tech Inc. designs, builds and factory-tests chemical injection, sampling, produced-water and gas-conditioning skids. Design data on our product pages gives psi and °F alongside bar and °C, and quotations, engineering and after-sales support come from our head office in Vaughan, Ontario, on Eastern Time.

Why a North American head office matters

  • Same time zone: US customers deal with a North American team for quotations, engineering questions and after-sales support.

  • Our own facilities: engineering and manufacturing are in our own facilities, and every system is proved in a factory acceptance test, with a written report, before it ships. Your own or third-party inspectors are welcome.

  • Familiar codes: pressure vessels to ASME Section VIII and process piping to ASME B31.3 where the duty calls for them.

  • Your site, your supply: voltage, frequency, hazardous-area classification and enclosure ratings are taken from your specification at quotation.

  • Documents with every offer: datasheet, P&ID and 3D model, with drawings submitted for approval before manufacture.

Chemical injection

  • Chemical Injection Skid: stores, meters and injects treatment chemicals into wells, flowlines, pipelines and process units at a controlled rate against line pressure. Models TI-CIS-200 to TI-CIS-10000 cover tanks from about 200 L to about 10 m³; flow and pressure are set for each injection point, from a few litres per day to several cubic metres per hour and up to 10,000 psi.

  • Multipoint Chemical Injection Skid: one pump header feeds individual flow-control lines, each held at its own rate regardless of the back-pressure at its injection point. TI-MPI-4 to TI-MPI-20 serve up to 4, 8, 12 or 20 points or more; a sour-service build has NACE MR0175 / ISO 15156 wetted parts.

  • Solar-Powered Chemical Injection Skid: for remote wellheads without grid power or instrument air; photovoltaic modules and a battery bank sized for the required autonomy, with RTU or cellular telemetry as an option. TI-SPI-1, -2 and -4 carry one, two or four DC metering pumps.

  • Portable Chemical Injection Unit: trolley, trailer or forklift skid for temporary treatment, batch injection, chemical trials and backup dosing; TI-PCU-50, -200 and -500 with tanks of about 50, 200 and 500 L.

  • Smart Chemical-Injection Retrofit Kit: adds tank level, flow verification at about 0.1 to 100 L/h and a cellular or Modbus link to skids already in the field, with solar power for sites without power.

  • Corrosion Monitoring Access Fittings and Injection Quills: TI-AF2 2-inch, 6,000 psi access fittings for coupons and probes, and fixed or retrievable injection quills.

Sampling and custody transfer

  • Closed-Loop Liquid Spot Samplers: representative grab samples into bottles, cylinders or vials with no release to air and no stagnant leg; TI-CLL-B bottles of 250 to 1,000 mL, TI-CLL-C cylinders and TI-CLL-V septum vials.

  • Gas Sampling Panel – Process, Natural and Sour Gas: a closed purge-fill-vent sequence with every vent and purge routed to flare or a safe location, including a sour gas and H2S version; TI-GSP-300 to TI-GSP-1500 for Class 300 to Class 1500 lines.

  • Natural Gas Composite Sampler (GPA 2166): flow-proportional grabs at a custody transfer point into a constant-pressure cylinder of 300 to 1,000 mL, designed to GPA 2166 and ISO 10715; a twin-cylinder version gives automatic changeover.

  • LACT Unit (Lease Automatic Custody Transfer): measures and transfers crude oil from a lease to a pipeline or terminal without an operator present, designed to API MPMS Chapter 6.1; TI-LACT-50 to TI-LACT-600 for about 50 to 600 m³/h.

Full range: Sampling Systems.

Sand, produced water and polishing

  • Wellhead Desander Skid: removes sand at the wellhead before it erodes chokes, pipework and separators, for well clean-up and flowback after drilling or stimulation. TI-WDS-3K, -5K and -10K are rated to 3,000, 5,000 and 10,000 psi, with tungsten-carbide or ceramic cyclone liners.

  • Produced Water Treatment Package: stages selected from your water analysis (CPI separator, skimmer, hydrocyclone, gas flotation, nutshell filter and polishing); TI-PWT-5 to TI-PWT-100 for about 5,000 to 100,000 bbl/d. Treated oil-in-water is typically below 40 mg/l for disposal and below 10 mg/l for injection, or to your limit.

  • Deoiling Hydrocyclone Skid: separates dispersed oil using the pressure from the upstream separator, with a booster pump option where that pressure is low.

  • Walnut Shell Filter: TI-NSF100 train for 100,000 barrels of produced water a day (about 662 m³/h), backwashed on differential pressure, timer or operator command.

  • Produced Water Cartridge Polishing Skid: TI-PF100 two-stage cartridge skid for 100,000 barrels a day, protecting injection pumps and wells.

Gas conditioning and vapour recovery

  • Fuel Gas Conditioning Skid: clean, dry, superheated gas for gas turbines, gas engines and generator sets, and fired heaters; superheat typically 28 °C (50 °F) above the hydrocarbon dew point and filtration typically to 0.3 µm; TI-FGC-2 to TI-FGC-50 for about 2,000 to 50,000 Sm³/h.

  • Gas Dehydration Skid (TEG / Molecular Sieve): TI-GDS-1 to TI-GDS-25 for about 1 to 25 MMSCFD; water dew point typically down to −10 °C (14 °F) with TEG and −70 °C (−94 °F) with molecular sieve.

  • Tank Vapour Recovery Unit (VRU): TI-VRU-S0.5 screw-compressor skid for 0.1 to 0.5 MMSCFD of vent gas from crude, condensate and produced-water tanks, discharging to fuel gas, a gathering line or a flare gas recovery system.

What to send us

  • Fluid or gas composition, including H2S and CO2, and a water analysis for produced-water duties.

  • Rates: chemical dose rates, barrels a day of water or MMSCFD of gas.

  • Design and operating pressure and temperature, in psi and °F or bar and °C.

  • Number of injection or sampling points, and their line sizes and pressure classes.

  • Site power (grid voltage and frequency, solar or none) and whether instrument air is available.

  • Hazardous-area classification and enclosure ratings.

  • The codes and company specifications that apply.

  • Telemetry or SCADA requirements.

  • Delivery location and required date.

Next step

Send your process data to mail@techincresearch.com, call +1 (289) 622-1032 (Eastern Time) or use our enquiry page. How a project works explains each step from enquiry to factory acceptance test, Shipping and export sets out how equipment is delivered, and every order is made under our Terms of Sale.

Data are typical and taken from each product page and datasheet; final design is to the client specification and the order acknowledgement.