IEC 61511 and ISA 84 Explained: Safety Instrumented Systems, SIL and HIPPS

Writer: Tech Inc
Tech Inc
1 day ago
2 min read

Where a pressure relief valve protects by venting, a safety instrumented system protects by acting: closing a valve, tripping a pump, isolating a well. IEC 61511, Functional safety: safety instrumented systems for the process industry sector, is the standard for those systems; in the United States it is adopted as ANSI/ISA-61511 (long known as ISA 84). It is the process-sector application of IEC 61508.

What it covers

IEC 61511-1 (edition 2, 2016, with amendment 1 2017) sets requirements for the specification, design, installation, operation and maintenance of a safety instrumented system through a safety lifecycle: hazard and risk assessment, allocation of safety functions to protection layers, the safety requirements specification, design and engineering, installation and validation, operation and maintenance, modification, and decommissioning. Part 2 is guidance on Part 1, Part 3 on determining the required safety integrity level. A safety instrumented function is assigned a SIL (1 to 4) by the risk reduction it must deliver, and the SIL sets the architecture, the hardware fault tolerance, the probability of failure on demand and the proof-test interval.

The design points

  • SIL determination by risk graph, LOPA or similar, done by the user; the vendor then designs to the resulting SIL.

  • Architecture: sensors, logic solver and final elements with the redundancy (1oo1, 1oo2, 2oo3) that the SIL and the diagnostic coverage require; certified components with failure-rate data.

  • Verification: calculated PFDavg against the SIL band, with the proof-test interval as the lever.

  • Independence from the basic process control system.

  • Proof testing and records over the life of the system; partial-stroke testing to extend intervals on valves.

What it means for our equipment

A HIPPS is a SIL-rated safety instrumented function: redundant pressure transmitters, a certified logic solver and fast-closing final elements with partial-stroke testing, delivered with the SIL verification report and the proof-test procedure. Our HIPPS high-integrity pressure protection systems, electro-hydraulic wellhead control panels and hydro-pneumatic wellhead control panels are built and documented to the standard; the IEC 60079 guide covers their hazardous-area side. All our standards guides.

Send your application, materials and the standards your contract names to mail@techincresearch.com or call +1 (289) 622-1032, and we will return a configuration, datasheet and quotation.

This article is our commentary on the standard's published scope, not a substitute for the standard itself; always work to the current edition named in your contract. Equipment specifications may change; performance depends on the application, how the equipment is used and operation in line with the operation manual.