Gas Odorization Skids for City Gas Distribution: Injection vs Bypass, Dosing and Safety

Natural gas has almost no smell of its own. Before it reaches homes, shops and small industry through a city gas distribution (CGD) network, it must be odorised so that a leak can be smelt long before it becomes dangerous. The odorisation skid at the city gate station is a small package with a large responsibility: if it fails, every customer downstream loses their first warning of a leak. This guide is for CGD engineers, EPC contractors and buyers specifying one.
Why odorise, and what the rules say
The aim is that a person with a normal sense of smell detects leaking gas at a concentration well below its lower explosive limit (LEL). In the United States, 49 CFR 192.625 requires gas in distribution lines to be odorised so that it is readily detectable at a concentration of one-fifth of the LEL. In India, the PNGRB technical standards for city or local natural gas distribution networks, commonly called T4S, require odorisation of gas supplied through CGD networks. Requirements are amended from time to time, so check the current schedule and any operator-specific rules before fixing the design basis.
Odorisation usually happens where gas enters the distribution network, typically at the city gate station, because transmission pipelines often carry unodorised gas for industrial users. New networks need extra attention: odorant can be absorbed by new steel pipe walls and lost through reactions with rust and deposits, an effect often called odour fade, so a new network may need a higher dose until the pipe is conditioned. Measure at the extremities rather than assume.
Choosing the odorant
THT (tetrahydrothiophene): widely used in Europe and Asia, stable, with a distinctive smell.
Mercaptan blends: based on tertiary butyl mercaptan with other sulphur compounds; strong odour at low dose, common in North America and elsewhere.
Sulphur-free odorants: acrylate-based alternatives that avoid adding sulphur to the gas, used where sulphur emissions or downstream catalysts are a concern.
The odorant choice sets the dose rate, material compatibility and handling procedures, so fix it early. Odorants can attack some elastomers, so confirm seal materials with the pump and valve makers. Many networks follow the practice of their gas supplier or neighbouring networks, so the public learns one smell.
Bypass or injection
A bypass (absorption) odoriser diverts a small part of the gas through a vessel containing odorant, where it picks up vapour before rejoining the main flow. It needs no power, but the pick-up depends on temperature, odorant level and the fraction of gas diverted, so dosing drifts. An injection odoriser pumps liquid odorant into the gas stream through an injection quill in proportion to measured gas flow. It is precise and auditable, but needs power, controls and a flow signal.
Factor | Bypass odoriser | Injection odoriser |
Dosing accuracy | Varies with temperature, level and flow | Flow-proportional and controlled |
Power | Not required | Required for pumps and controller |
Flow range | Suits steady, low flows | Handles wide turndown |
Records | Limited | Dose rate and consumption logged |
Typical use | Small, remote, low-flow stations | City gate stations and CGD networks |
Capital cost | Lower | Higher |

Dosing and verification
The dose rate is set in milligrams of odorant per standard cubic metre of gas (mg/Sm³) by the operator, within any limits the regulator sets, and depends on the odorant and the network. Under-odorisation is a safety risk; over-odorisation wastes odorant, adds sulphur to the gas and generates nuisance complaints. Control is flow-proportional: the controller takes the gas flow signal from the metering skid's flow computer and adjusts the pump stroke rate so the dose stays constant as flow changes. Verification works at three levels:
At the skid: odorant consumption from a flow meter or calibrated level measurement, compared with gas volume, gives the actual average dose.
In the network: odorant concentration measured at far points of the network with a portable instrument or an online analyser.
By smell: periodic sniff tests at agreed points, recorded as the procedure requires.
At commissioning, the dose is set at a known flow, checked against consumption over the first days of operation, then confirmed by measurements at the network extremities. Keep dose records for audits: daily gas volume, odorant used and calculated dose.
Locating the injection point
Inject downstream of the meter run that supplies the flow signal, so the dose follows measured flow, and upstream of any branch, so every downstream customer receives odorised gas. Injection is commonly made on the lower-pressure side of the station, which reduces the pump discharge pressure, but follow the operator's standard. The quill should reach into the gas stream, typically near the centre of the pipe, so liquid odorant disperses rather than running along the pipe wall.
Skid design essentials
SS316 odorant storage tank built as a pressure vessel to ASME Section VIII or PED, with level instruments and a nitrogen blanket to keep air and moisture out.
Activated-carbon filter on any vent, so odorant vapour does not reach the surroundings.
Duty and standby metering pumps, hermetically sealed.
Flow verification on the pump discharge, so actual stroke volume can be checked against the controller's setting.
Injection quill with a check valve and isolation.
Spill containment under the tank and pumps, and an odour-neutralising agent kept on site.
Electrical equipment certified for the hazardous area.
Closed transfer from odorant drums or containers into the storage tank, with vapour return, so filling releases no odour.
Odorants are flammable liquids with an odour detectable at extremely low concentration, so a small spill can trigger a wave of gas-leak calls across a neighbourhood. That is why closed handling matters as much as dosing accuracy.
What to send us
Gas flow range, minimum to maximum, in Sm³/h, and pressure at the injection point.
Odorant type and target dose rate.
Required storage autonomy in days between refills, and the refill method.
Flow signal type from the metering skid, and the SCADA interface.
Power supply, hazardous area classification and ambient conditions.
Whether a standby odoriser is needed during maintenance.
Applicable regulations and company standards.
Odorisation from one supplier
We design the gas odorization skid in Vaughan, Canada and build it in Chennai, India, alongside the gas metering skid that supplies its flow signal and PLC, RTU and SCADA control packages for the station. Each skid is factory acceptance tested, witnessed by the client or a third-party inspector, with EN 10204 3.1 material certificates. The pump choices are the same as for other chemical dosing duties, covered in diaphragm versus plunger metering pumps, and our chemical injection skid specification checklist applies to odorant skids too. Browse our chemical injection systems and the full oil and gas systems range. Send your gas flow range, odorant and site data to mail@techincresearch.com or call +91 739 749 8656 and we will return a P&ID, GA drawing and priced offer.