Crude oil at line pressure carries dissolved gas, and in sour service that gas includes H2S. Open a sample valve on a 1500 psi line straight into a bottle and the liquid flashes: gas breaks out violently at the valve and the operator is standing in it. A flash-drum sampling station puts a small pressure vessel between the line and the bottle, lets the gas come out of solution in a controlled way to a closed system, and only then releases the liquid. This article explains how our two flash-drum designs work, for refinery and production engineers specifying high-pressure crude sample points.
Why high-pressure crude needs a flash drum
Gas dissolved in crude at high pressure behaves like the gas in a shaken bottle. As soon as the pressure falls, it comes out of solution, and at 1500 psi the release is fast and forceful. An open sample valve on such a line produces a high-velocity jet of liquid and gas, a vapour cloud around the operator and, in sour service, an H2S exposure at breathing height. The liquid in the bottle is also unstable, still releasing gas as it sits.
A flash-drum station fills a small drum at line pressure, isolates it, and then brings it down to atmospheric pressure through a vent to a closed system. Dissolved gas breaks out inside the drum rather than at the operator. Only when the drum is at zero pressure is the liquid transferred to a sample bottle. Every step is visible on gauges, and the valve arrangement makes the steps hard to perform out of order. A sudden, uncontrolled release becomes a slow, contained one.
Design A: closed transfer
Design A is the station Saudi Aramco approved at drawing stage. Its logic is that the operator should not be able to get the order wrong. It completes one sampling cycle in four movements:
Flush and vent. The 7-litre drum is flushed and vented to the closed drain.
Fill. The drum fills at line pressure until the inlet and drum gauges agree.
Depressurise. The drum is vented until all three gauges read zero. A pressure-actuated interlock then releases the sample path; while the drum holds pressure, the path stays locked.
Collect and drain. Spring-return sample and drain valves deliver the liquid into a closed 1-litre bottle on quick-release couplings.
Seven layers of protection stand behind that cycle:
A pressure-actuated interlock that keeps the sample path closed until the drum is depressurised.
Spring-return sample and drain valves, which close when the operator lets go.
Double inlet block valves and a check valve, to SABP-A-109.
Two high-range gauges that cross-check each other.
A low-range residual-pressure gauge with an over-pressure protector, to confirm the drum is truly at zero.
Block-and-bleed valves on every gauge, so each can be isolated and replaced safely.
A two-valve vent.
Design A specifications
Maximum operating pressure: 1500 psi (about 103 bar).
Design and hydrotest pressure: 3000 psi (about 207 bar).
Design temperature: 200 °F (about 93 °C).
Process tie-ins: 3/4 in Class 1500 RTJ.
Slops drain: 1 in Class 150 RF.
Wetted parts: Inconel 625, to NACE MR0175/ISO 15156.
Frame: SS316, in left-hand and right-hand builds.
Weight: approximately 200 kg.
Utilities: none required.
Design B: monitored collection
Design B gives the operator two extra pieces of information before collection: how much liquid is in the drum, and how hot it is. Collecting only below a set temperature protects the operator from hot crude and keeps the collected liquid calmer in the bottle. Its features:
A level gauge on the drum, rated 1500 psi, so the operator sees the liquid level.
A temperature gauge in a thermowell; samples are collected only below 140 °F (60 °C).
Throttle valves on the vent, for controlled depressurisation.
Check valves on the inlet and on the vent.
A 4-litre sample bottle.
An eye-wash and a sun shade at the station.
A 7.41-litre drum designed for 1500 psi and 230 °F (about 110 °C), with three 1 in Class 1500 RTJ connections.
Design A and Design B compared
Feature | Design A: closed transfer | Design B: monitored collection |
Approach | Interlocked four-movement cycle | Level and temperature checked before collection |
Drum volume | 7 litres | 7.41 litres |
Pressure | MOP 1500 psi; design and hydrotest 3000 psi | Design 1500 psi |
Design temperature | 200 °F | 230 °F |
Connections | 3/4 in Class 1500 RTJ tie-ins; 1 in Class 150 RF slops drain | 3 × 1 in Class 1500 RTJ |
Sample bottle | Closed 1-litre bottle on quick-release couplings | 4-litre bottle |
Key safeguards | Pressure-actuated interlock, spring-return valves, double block and check, cross-checked gauges | Level gauge, 140 °F (60 °C) collection limit, throttled vent, inlet and vent check valves, eye-wash and sun shade |
Status | Approved by Saudi Aramco at drawing stage; supplied in series to Saudi Aramco refineries | Ordered by Saudi Aramco in 2026 |
Design A suits sites that want the sampling cycle enforced by hardware: the operator cannot open the sample path while the drum holds pressure, the valves close when released, and the station needs no utilities. Its Inconel 625 wetted parts, selected to NACE MR0175/ISO 15156, and its 3000 psi design and hydrotest pressure suit sour, high-pressure crude service. Design B suits procedures where the operator must see the drum level and the sample temperature before collecting, where a larger 4-litre sample is needed, and where an eye-wash and sun shade are wanted at the station.
How the stations are tested
The test programme covers hydrotest; dimensional, visual and functional bench tests; positive material identification (PMI); dye-penetrant examination; and intergranular corrosion testing to ASTM G28 Method A. PMI confirms that every wetted component is the alloy specified, which matters when nickel alloy and stainless steel parts look alike. The ASTM G28 Method A test checks the nickel alloy's resistance to intergranular attack, and dye-penetrant examination finds surface-breaking defects. Material certificates are issued to EN 10204 3.1, and factory acceptance testing is witnessed by the client or a third-party inspector.
Design A has been supplied in series to Saudi Aramco refineries, and Design B was ordered by Saudi Aramco in 2026. The Inconel 625 build is described in Inconel 625 from seat to spring.
What to tell us about your sample point
Maximum operating pressure and temperature of the line.
Connection size, pressure class and facing required at the tie-in.
Closed drain and slops connections available at the location.
Sample volume the laboratory needs per test.
H2S content and the materials standard that applies.
Access side, for a left-hand or right-hand build.
Inspection and documentation requirements.
Specify a flash-drum station for your crude lines
Both designs are engineered in Vaughan, Canada and built in Chennai, India. See the product pages for Design A, closed transfer and Design B, monitored collection, read about operator protection in closed-loop sampling for H2S and benzene service, and browse our sampling systems and the full oil and gas systems range. Send your line pressure, temperature, connection standard and sampling procedure to mail@techincresearch.com or call +91 739 749 8656 and we will return a P&ID, GA drawing and priced offer.