top of page

High-Pressure Gas Systems Compared: Pressure, Gases, Flow and Standards

Writer: Tech Inc
Tech Inc
6 hours ago
5 min read
High-Pressure Gas Systems Compared: Pressure, Gases, Flow and Standards

Bottom line: for helium and nitrogen at up to 400 bar (5,800 psi), the storage and distribution skid, mobile servicing rig and pressurisation, purge and command-gas panel cover storage, mobile servicing and distribution to each circuit. Laboratories and plants that draw gas from cylinders need a changeover manifold, gas panel or distribution system. Process duties such as blanketing, purge and recovery have their own skids below.


Storage, servicing and test systems

System

Gases

Pressure

Capacity or flow

Control and features

Codes and standards

helium or nitrogen

storage up to 400 bar (5,800 psi)

24 cylinders per skid

local gauges, or transmitters and remote valves

–

helium or nitrogen

up to 400 bar (5,800 psi)

to client specification

charging, pressure testing, purging; manual or PLC

–

helium or nitrogen

inlet up to 400 bar (5,800 psi)

circuits to client specification

solenoid valves with manual isolation; PLC or hard-wired

–

helium and nitrogen

up to 400 bar (5,800 psi)

sized to test duration and runs

PLC with interlocks; storage, boosting, panels and piping

–

helium, nitrogen, air

to about 300 or 400 bar (4,350 or 5,800 psi)

–

remote control with interlocks; data logged

ASME B31.3 practice

dry, oil-free nitrogen

up to about 350 bar (5,080 psi)

2 to 6 cylinders, or trailer bank

air-driven or electric booster

ASME B31.3 practice

hydrogen or helium

gas to about 1,000 bar (14,500 psi); hydraulic burst to about 4,000 bar (58,000 psi)

–

programmable cycling; −40 to +85 °C conditioning on request

ISO 19880-3, ISO 19880-5, ISO 12619

–

to about 450 bar (6,530 psi)

cylinders up to about 80 L

expansion by burette or weighing; records and certificates

ISO 18119, ISO 11623, CGA C-1

–

–

tube about 1/8 to 1 inch

orbital TIG; helium leak test; weld records

ASME B31.3 practice


Gas supply, distribution and pressure control

System

Gases

Pressure

Capacity or flow

Control and features

Codes and standards

hydrogen and industrial gases

inlet up to 200 bar (2,900 psi)

about 25 to 600 Nm³/h

wall panel or skid; SS316

client's gas safety specification

inert, flammable, oxidising and specialty

inlet to about 200 or 300 bar (2,900 or 4,350 psi); outlet about 0 to 10 barg (0 to 145 psig)

two cylinders or two banks

differential or electronic switching; alarms

ASME B31.3 practice; ASTM G93

laboratory and process gases

inlet to about 300 bar (4,350 psi); distribution about 5 to 15 barg (73 to 218 psig)

laid out to the building

316L tube; gas detection and shut-off

ASME B31.3

CO2, nitrogen, argon, helium, hydrogen, air, mixtures

inlet 200 or 300 bar (2,900 or 4,350 psi); outlet typically 1 to 10 barg (15 to 145 psig)

1 to 4 gases

changeover and low-pressure alarms

ASME B31.3

oxygen

inlet to about 200 bar (2,900 psi)

–

slow-opening valves; oxygen-compatible seals

ASTM G93; ASME B31.3 practice

He, N2, Ar, H2, specialty

fill 200 or 300 bar (2,900 or 4,350 psi)

6, 12 or 24 filling points

fill controller with temperature compensation

ASME B31.3

air, N2, He, inert gases

vacuum to about 200 bar (2,900 psi)

–

ramp, hold and cyclic profiles; ±0.05% FS typical

–

–

up to about 700 bar (10,000 psi)

µL/min to pilot scale

to about 200 °C (392 °F) by seat; 1/16 to 1/2 inch fittings

–

hydrogen

inlet 200 or 300 bar (2,900 or 4,350 psi)

fuel cells to about 100 kW

excess-flow valves; detection; alarms

ASME B31.12

non-reactive and reactive

vacuum to about 10⁻³ mbar

cylinders up to about 50 L

electropolished 316L, helium leak-tested

ISO 6142-1; ISO 6143

breathing air

storage 300 bar (4,350 psi)

about 60 to 240 m³ free air

fill enclosure; slow-fill restrictors

EN 12021; ASME B31.3 practice

breathing air

50 L, 300-bar cylinders

up to 12 workers

automatic bank changeover; alarms

EN 12021


Process and industry gas skids

System

Gases

Pressure

Capacity or flow

Control and features

Codes and standards

nitrogen or CO2

matched to the gasifier

about 100 to 1,500 Nm³/h

boosters; PLC sequence control

pressure vessel code or client specification

nitrogen

low pressure, set to the tank

about 25 to 300 Nm³/h

skid, wall panel or tank-top

–

hydrogen; nitrogen purge

–

–

back-pulse filter candles; PLC purge sequences

ASME VIII or client specification

air, O2, N2, CO2

–

vessels about 5 to 5,000 L

thermal mass flow controllers; SS316L

–

aqueous or anhydrous ammonia

–

about 5 to 200 kg/h ammonia

PLC with NOx trim; ammonia detection

ASME B31.3; IEC 60079

nitrogen with hydrogen

–

about 500 to 6,000 Nm³/h

up to about 20 zones; PLC, HMI, DCS link

ASME B31.3; IEC 60079

HFCs, HFOs and blends

to about 30 barg (435 psig)

about 50 to 400 kg/h

automatic purge of non-condensables

ASME VIII, ASME B31.3; AHRI 700

helium

storage about 150 to 300 bar (2,180 to 4,350 psi)

about 5 to 100 Nm³/h

purity typically 99.99% or better; analysers; PLC

ASME VIII, ASME B31.3

oxygen

cones to about 3 barg (44 psig)

about 10 to 400 kg O2 per day

dissolved-oxygen control; super duplex 2507 or 316L

–

SF6; alternative mixtures

filling to about 10 bar (145 psi); vacuum to about 1 mbar

scale to about 100 kg, about 10 g resolution

DN8 and DN20 self-sealing couplings

IEC 62271-4

liquid nitrogen

–

about 5 to 200 L/day

nitrogen about 99.5% or better; automatic start-stop

IEC 61010; ASME B31.3 practice

hydrogen (PEM)

generator about 16 bar (232 psi); booster about 100 bar (1,450 psi)

about 0.5 to 1 L/min

leak detection, relief, flame arrestor, shut-down

IEC 61010-1; ASME B31.3 practice


How to choose

  • Start from the highest pressure anywhere in the system, including boosters and cylinder banks, not the use pressure.

  • Gas decides materials and cleaning: oxygen needs oxygen-clean parts; hydrogen needs suitable materials, detection and venting.

  • Hazardous areas: give us the area classification so electrical components are selected to it.

  • Cylinder supply or recovery: count the cylinders or flow you use each day before choosing manual, automatic or bulk supply.

  • Ask for the design code and test records you need at the enquiry stage.



Before you order

Send us your samples, operating conditions and the standard you work to, and we will confirm the model. Equipment carries our standard warranty and installation, training and service terms: see Service and Support and our Terms of Sale. Send an enquiry or email mail@techincresearch.com.


Data are typical and taken from each product page and datasheet; final design is to the client specification and the order acknowledgement. Check the product page or ask us before you order.

Comments


bottom of page