top of page

Application Note: Setting Up a Gas Cylinder Requalification Line

Writer: Tech Inc
Tech Inc
5 days ago
2 min read

At a glance. Breathing-apparatus, fire-suppression, medical and industrial gas cylinders must be inspected and retested at intervals set by the regulations and the cylinder standard. A requalification line takes each cylinder through the same sequence, records the result and returns it to service or condemns it.

The sequence

  1. Receipt and identification. The cylinder is logged by serial number, maker, standard and last test date.

  2. Depressurising. Residual gas is vented or recovered safely.

  3. Valve removal. The valve is removed with a torque machine and set aside for service.

  4. External inspection. Dents, cuts, corrosion, fire damage and illegible markings are checked against the rejection criteria.

  5. Internal inspection. An inspection lamp shows corrosion, contamination or cracks inside.

  6. Hydrostatic test. In the water-jacket method the cylinder is pressurised to its test pressure inside a water-filled jacket; total and permanent volumetric expansion are measured, and the ratio decides pass or fail. Some cylinder types use other methods set by their standard.

  7. Drying. Warm, dry air removes all water before the valve is refitted.

  8. Valve service and refitting. Valves are cleaned, serviced or replaced and refitted to the specified torque.

  9. Marking and records. The test date and station mark are applied, and the certificate and records are filed.

Line layout

Arrange the steps in a single flow so cylinders never wait in the wrong place: receipt and venting, valve removal, inspection, testing, drying and valve refitting, marking and dispatch. Keep the hydrostatic test in a protected area with an interlocked jacket lid.

Equipment checklist

Water jacket with hoist and test pump, expansion measurement and calibrated transducer, inspection lamp, drying station, valve torque machine, marking tool, software for records and certificates, and reference cylinders or standards for daily checks.

Where Tech Inc. equipment fits

Related reading

Sources

This note is general information. Intervals, methods and rejection criteria follow the cylinder standard and the regulations the test station is approved under.

Comments


bottom of page