Hydraulic Pressure Hold Tests: Procedure and Records

At a glance. The part is filled with water or oil, all air is bled, and pressure is raised to the test level and held while the drop is recorded. The Tech Inc. Hydraulic Pressure Hold and Leak Tester uses an air-driven pump and a digital recorder that prints certificates.
Procedure
Check the test pressure and hold time in the code or specification.
Fill and vent all air.
Raise pressure in stages, checking for leaks.
Isolate the pump and start the hold.
Record pressure and temperature throughout.
Depressurise slowly and drain.
Reading the result
Pressure changes with temperature as well as leaks. Record water or oil temperature and allow it to stabilise before the hold.
Safety
Exclusion zone around the part.
Relief valve set above test pressure.
Rated hoses and restrained connections.
Never use gas for a hydrostatic test.
Frequently asked questions
What test pressure? Many codes use 1.5 times design pressure for hydrostatic tests; follow the code that applies.
Need higher pressure? See our high-pressure hydrostatic test unit.
Contact mail@techincresearch.com.





Comments