Application Note: Proving Chemical Injection Without a Site Visit

Writer: Tech Inc
Tech Inc
6 days ago
2 min read

At a glance. Corrosion, scale, hydrate and wax inhibitors protect pipelines only while they are being injected at the right rate. Field injection skids are often visited weekly or less, so a stopped pump or an empty tank can go unnoticed for days. Adding tank level, injection-flow verification and a remote link to existing skids lets the operator see, every hour, that the chemical is going in.

Why availability matters

Internal-corrosion control programmes, such as those described in NACE SP0106, rely on inhibitor being present whenever the line is flowing. Time without injection is time without protection, and it rarely shows until an inspection finds the damage.

What to add, in order

  1. Tank level – a radar or pressure transmitter shows stock and, over time, actual consumption.

  2. Flow verification – a low-flow meter or an automatic calibration column measures what the pump actually delivers, not what it is set to deliver.

  3. Remote link – a small RTU sends level, flow, pump status and alarms to SCADA or a monitoring platform over cellular or the plant network.

  4. Power – a solar panel and battery run the instruments where there is no power.

What the data shows

  • Pump stopped or lost prime

  • Injection rate drifting from the set point

  • Tank running low, so deliveries can be planned

  • Consumption per well or per line, to check the treatment programme

Hazardous areas

Instruments and the RTU on a wellsite must carry certification for the zone they sit in, and installation follows the site's hazardous-area rules.

Where Tech Inc. equipment fits

Related reading

Sources

This note is general information. Retrofit scope follows a survey of each skid and the operator's monitoring system.