top of page

Tech Inc. for US laboratories and energy companies: lab, pilot and skid systems with a North American head office

Writer: Tech Inc
Tech Inc
1 day ago
2 min read

Tech Inc. designs, builds and factory-tests laboratory, pilot and skid-mounted systems for universities, national laboratories and energy companies. Our head office is in Vaughan, Ontario, on Eastern Time, so US customers deal with a North American team for quotations, engineering questions and after-sales support. Engineering and manufacturing are in our own facilities, and every system is proved in a factory acceptance test before it ships.

What US laboratories and plants buy from us

Built for US practice

  • US units on every specification: design data on our product pages gives psi and °F alongside bar and °C.

  • Familiar codes: pressure vessels to ASME Section VIII and process piping to ASME B31.3 where the duty calls for them.

  • Your site, your supply: voltage, frequency, hazardous-area classification and enclosure ratings are taken from your specification at quotation.

  • Documents with every offer: datasheet, P&ID and 3D model, with drawings submitted for approval before manufacture.

  • Proof before shipment: factory acceptance test with a written report; your own or third-party inspectors are welcome.

Planning a grant proposal?

Research groups preparing instrumentation proposals can ask for a budgetary quotation that describes the system, its scope and its test plan, so the budget in the proposal matches the instrument you will order. Tell us the decision date and we will set the quotation's validity to suit.

How to start

Send your process data or research protocol to mail@techincresearch.com or call +1 (289) 622-1032 (Eastern Time). For oil and gas systems, the fillable enquiry datasheet lists everything our engineers need for a firm quotation. See also what to send for a fast, firm quotation.

Sector guides for US buyers


Specifications and scope are confirmed in each quotation; values depend on the application and adherence to the operation manual.

Recent Posts

See All

Comments


bottom of page