Precious-Metal Recovery from E-Waste and Catalytic Converters Explained: Leach, Separate and Recover


Bottom line: precious metals in e-waste and spent catalytic converters are recovered by a hydrometallurgical line that leaches the metals into solution, separates them, and recovers each as metal or salt. The chemistry is chosen for the feed, but every good line shares the same essentials: corrosion-resistant materials, scrubbers for the fumes, treatment of the spent liquors, and careful metal accounting batch by batch.
What the process is
Shredded printed circuit boards and connectors carry gold, silver and palladium. Spent catalytic converters carry the platinum-group metals platinum, palladium and rhodium, held on a ceramic support. Per tonne, both feeds contain more of these metals than many ores, which makes them worth recovering, but they need a recovery route that is clean and that can account for every gram.
A wet recovery route has three stages. First the shredded or milled feed is leached in corrosion-resistant reactors to take the metals into solution, and the solids are filtered out. Next the metals are separated from each other, by solvent extraction or selective precipitation. Finally each metal is recovered by electrowinning, cementation or chemical reduction. Throughout, fumes are scrubbed, liquors are treated and every batch is recorded.
How the equipment works
The Tech Inc. Precious-Metal Recovery Line for E-Waste and Catalytic Converters is a complete line, from leach to metal:
Leach reactors: in lined steel, glass-lined or alloy, depending on the chemistry.
Filtration: a filter press or candle filters separate the leach residue.
Solvent extraction: mixer-settler stages separate the metals in solution.
Precipitation and reduction reactors: for selective precipitation and chemical reduction.
Electrowinning cells with rectifier: recover metal directly from solution.
Fume scrubber and effluent treatment: treat the gases from the leach and the spent liquors.
Wetted parts are PP, PVDF, glass-lined or alloy as the chemistry requires. The PLC keeps batch records. Pressure parts are built to ASME VIII where applicable, and the electrical design follows IEC 60204-1.
Key design choices
Feed and line type. There are two families of line: a gold–silver line for e-waste feeds and a PGM line for catalytic-converter feeds. The feed decides the leach chemistry and the separation steps.
Chemistry. Lines are built for acid and halide leaches, cyanide-free routes and others, chosen with your process licensor or from test work. Because the chemistry sets the materials, the choice of route comes first.
Materials. Hot acid and halide solutions attack many metals, so the wetted parts are chosen from PP, PVDF, glass-lined steel and alloys to suit the route.
Recovery method. Electrowinning, cementation and chemical reduction each suit different metals and solution strengths. The line can combine them so that each metal is recovered in the form you want to sell.
Scale. Indicative feed capacities run from a pilot of about 25 to 100 kg per batch (TI-PMR-P) to about 1 t/day (TI-PMR-1) and about 5 t/day (TI-PMR-5), with a dedicated catalytic-converter line (TI-PMR-PGM). Sizes between and beyond these are built to order.
Shredding and smelting. Tech Inc. builds the wet-chemistry line and integrates bought-in shredding and smelting where needed.
Metal accounting
With high-value metals, recovery is only half the job. Metal is accounted for by weighed feed, sampled liquors and recovered metal, logged per batch. That record supports both process control and the commercial settlement between a recycler and its suppliers.
Why pilot first
A pilot line runs test batches on your own feed, so recoveries, reagent use and effluent loads are measured before a production line is sized. A pilot test campaign is offered as an option.
What to specify
When you ask for a quotation, send:
Feeds: circuit boards, connectors or catalytic-converter material, with an analysis of each and how it is prepared (shredded or milled).
Tonnages: test quantities for a pilot and the target throughput for production.
Target metals: which metals you want to recover, and whether as metal or salt.
Chosen route: the leach chemistry, if you already have one from a process licensor, or a request for test work.
Upstream equipment: whether shredding or smelting must be integrated.
Effluent and emissions: local limits for the scrubber and effluent treatment.
Site utilities: power supply, process water, cooling water, compressed air and reagents.
Scope of supply
A standard supply includes the reactors, filters, extraction and recovery units with controls; the scrubber; a function test; training; a factory acceptance test with a written report; drawings for approval, material certificates and an operation and maintenance manual. Options include a pilot test campaign, effluent treatment, a laboratory set-up, and installation and commissioning.
Next steps
Model data, design data and the datasheet are on the Precious-Metal Recovery Line product page. To plan a line for your feed, send your feeds, tonnages and target metals through the enquiry page or to mail@techincresearch.com, and we will confirm the selection with a datasheet and GA drawing before manufacture.