top of page

The Tech Inc. Spent-Catalyst Metal Recovery Pilot Plant recovers molybdenum, vanadium, nickel and cobalt from spent hydroprocessing catalysts. The catalyst is de-oiled and roasted, molybdenum and vanadium are leached with alkali and separated by precipitation or ion exchange, and nickel and cobalt are recovered from the residue by acid leaching, so refiners and recyclers can prove a route before building a plant.

At a glance: 25 kg batches to 50 kg/h continuous · molybdenum, vanadium, nickel, cobalt · roast, leach, separate, precipitate · full mass balance

Download the datasheet (PDF)

 

Main components

  • De-oiling and roasting step (bought-in furnace integrated)
  • Alkaline leach reactor and filter
  • Molybdenum and vanadium separation by precipitation or ion exchange
  • Acid leach for nickel and cobalt
  • Precipitation and drying
  • Scrubber and controls with batch records

 

Applications: catalyst recyclers, refinery research centres and metals laboratories evaluating spent catalysts as a metal source.

 

Send your process data and specification to mail@techincresearch.com or call +1 (289) 622-1032 for a P&ID, GA drawing and quotation.

Spent-Catalyst Metal Recovery Pilot Plant

bottom of page