Core Flooding Systems: What They Measure and How to Specify One

At a glance. A core flooding system drives brine, oil, gas or chemicals through a rock plug at reservoir pressure and temperature while it measures pressure drop and produced fluids. The Tech Inc. Core Flooding System combines a Hassler core holder in an oven, pulse-free syringe pumps, transfer vessels and a dome-loaded back pressure regulator.
Typical tests
Test | Result |
Absolute permeability | Darcy permeability to brine |
Steady-state or unsteady-state relative permeability | kr curves for oil, water and gas |
Waterflood and chemical EOR | recovery factor, residual oil |
CO2 and gas injection | displacement efficiency, injectivity |
Formation damage and acidising | return permeability |
The main components
Core holder with a rubber sleeve and confining pressure.
Pumps: dual-cylinder syringe pumps for steady, pulse-free flow.
Transfer vessels that keep corrosive or live fluids away from the pumps.
Back pressure regulator to hold pore pressure and keep gas in solution.
Measurement: differential and absolute transducers, effluent balance or separator.
Specification checklist
Core sizes and lengths.
Maximum pore and confining pressure, and temperature.
Fluids (brine, dead or live oil, CO2, polymer, acid) and wetted materials.
Flow range of each pump.
Effluent measurement and analysis.
Data logging and safety requirements.
Frequently asked questions
Why a dome-loaded BPR? It controls pressure smoothly at very low flows and with two-phase fluids. See our back pressure regulators.
Can the same rig do formation damage tests? Yes, with reverse-flow valves and return permeability steps.
Send your test programme to mail@techincresearch.com.





Comments