The Tech Inc. Hydrotest and Leak-Test Pump Skid pressure-tests pipelines, piping systems and vessels on site before start-up and after repairs. A high-pressure plunger pump, water tank, test manifold and recorder sit in one lifting frame that contractors move from job to job.
At a glance: to about 1,000 bar · about 5 to 60 L/min test flow · fill pumps to about 1,000 L/min · electric, diesel or air drive · data logger
Main components
- High-pressure plunger pump with electric motor or diesel engine
- Break tank with fill filter and level gauge
- Test manifold with isolation, bleed and relief valves
- Calibrated gauges and pressure and temperature recorder
- Hose reels and quick couplings
- Lifting frame with forklift pockets and lifting lugs
Applications: pipeline and plant pre-commissioning, turnaround and shutdown work, and rental fleets.
Send your process data and specification to mail@techincresearch.com or call +1 (289) 622-1032 for a P&ID, GA drawing and quotation.


