The Tech Inc. Lithium Direct-Extraction Pilot Skid for Oilfield Brines tests direct lithium extraction on hot, salty oilfield and geothermal brines. Brine is filtered and cooled, then passed through columns of a lithium-selective sorbent supplied by the technology owner; the loaded sorbent is eluted with water or dilute acid, and the eluate is polished and concentrated for conversion to lithium carbonate or hydroxide. Super duplex and lined pipework resist the chloride-rich brine.
At a glance: about 1 to 5 m³/h of brine · super duplex and lined · sorbent columns in lead–lag · eluate polishing · containerised option
Main components
- Brine pretreatment: filtration, cooling and oil removal
- Sorbent columns with valves for load, wash and elute
- Eluate polishing by ion exchange
- Concentration step (membrane or evaporation, bought in)
- Brine return and pH control
- PLC with cycle control and data logging
Applications: oil and gas operators, mining companies and technology owners piloting lithium recovery from produced water and geothermal brines.
Send your process data and specification to mail@techincresearch.com or call +1 (289) 622-1032 for a P&ID, GA drawing and quotation.


