The Tech Inc. Biogas H2S Removal Skid removes hydrogen sulphide from biogas before it reaches the upgrading unit, compressor or gas engine. H2S corrodes equipment and poisons membranes and catalysts, so CBG and biogas plants remove it at the start of the gas train.

Download the datasheet (PDF)

 

Main components

  • Two adsorber vessels filled with iron-oxide or impregnated activated-carbon media
  • Lead/lag valve manifold so one vessel can be recharged while the other runs
  • Gas blower or booster where the biogas is at low pressure
  • Moisture knock-out pot and condensate drain
  • H2S sample points and an optional online H2S analyser
  • Control panel, pressure and temperature instruments on a skid

 

Applications: compressed biogas (CBG) plants, biogas-to-power plants, landfill gas and digester gas systems.

 

Send your process data and specification to mail@techincresearch.com or call +1 (289) 622-1032 for a P&ID, GA drawing and quotation.